Once the pod is on site, its envelope inflates and the cuboid unfolds into a dome with a hexagonal base. The equipment stored in the middle of the pod is put into place, and the pod becomes functional. The pods are connected via airlocked bridges with different air pressures to prevent the spread of infection.